Shipyard News
JANUARY 30, 2014 — Detyens Shipyards, Inc., North Charleston, S.C. is being awarded a $9,654,055 firm-fixed-price contract for a 55-calendar day regular overhaul and drydocking of fleet replenishment oiler USNS Leroy Grumman (T-AO 195).  …
JANUARY 30, 2014 — Delivery of the first of the three construction vessels building for Cecon ASA at shipbuilder Chantier Davie Canada Inc., Lévis, Quebec, has been delayed until sea ice conditions permit the sea…
JANUARY 30, 2014 — Vigor Marine LLC, Portland, OR, is being awarded a $6,655,679 firm-fixed-price contract for a 55-calendar day regular overhaul and drydocking availability of fleet replenishment oiler USNS Yukon (T-AO 202). Work will…
JANUARY 29, 2014 — Fraser Shipyards, on the west end of Lake Superior, in Superior, WI, is planning for the third phase of a facility modernization plan. A Superior Telegram report by Shelley Nelson says…
JANUARY 27, 2014 — Singapore's ASL Marine Holdings and Miclyn Express Offshore (MEO) — along with their respective Indonesian shipbuilding subsidiaries – have reached an agreement that will see ASL acquire MEO's Batam, Indonesia, shipyard…
JANUARY 22, 2014 — The Gulfport, MS, shipyard of Gulf Coast Shipyard Group (GCSG), Inc., has launched the first of the six 302 ft x 64 ft dual fuel offshore supply vessels that it is…
JANUARY 19, 2014 —  Austal USA, Mobile, AL, last week successfully launched the USNS Fall River (JHSV 4). The 103 m high speed catamaran was launched in a multi-step process that saw Berard Transportation transfer…
JANUARY 18, 2014 — Gulfport, MS, headquartered Gulf Coast Shipyard Group has leased space at the Port of Gulfport, to complete the series of LNG fueled platform supply vessels that it is building for Harvey…
JANUARY 17, 2014 — With Singapore aiming to be a hub for LNG bunkering and regional LNG distribution there will be a need for more small to medium scale LNG carriers and LNG bunkering vessels.…
JANUARY 17, 2014 — General Dynamics Electric Boat Corp., Groton, CT, is being awarded a $29,848,059 modification to a previously awarded contract (N00024-11-C-2109) to exercise an option for engineering and technical design services to support…
Page 6 of 43