NOVEMBER 14, 2012 — BP Shipping has finalized a contract with Boeing subsidiary Jeppesen that will see the installation of Jeppesen's Vessel and Voyage Optimization Solution (VVOS) on 52 BP vessels carrying crude oil and LNG shipments globally. The contract also provides for integration of Jeppesen's FleetManager shoreside component into BP Shipping operations. FleetManager will be used to track BP's owned and chartered vessels.
Jeppesen says that VVOS will help BP vessels optimize ship routes and engine settings to increase efficiency, minimize risks such as cargo loss and weather damage, and reduce fuel costs. Jeppesen's FleetManager component allows BP's shoreside managers to monitor vessel performance at sea, while receiving detailed reports on any vessel's current operating environment. In addition, Jeppesen's Vessel Routing Services provide the support of experienced ship masters to analyze ship data and respond with 24/7 route planning and advisory services to optimize operational efficiency.
"Over the years, BP Shipping has demonstrated a strong commitment to improved vessel efficiency and reduction of carbon emissions," said Jeppesen director of Professional Services Joel Meltzner. "We're honored that — following an in-depth evaluation of today's most advanced technologies — BP Shipping selected Jeppesen as its optimization partner for these vessels."
Jeppesen says its solutions provide several key operational advantages to BP Shipping and its vessels at sea. These include the ability for ship masters to optimize routes according to speed, ETA, fuel consumption and ship motions (based on detailed computer models of BP vessels and predicted impacts according to weather). In addition, C-MAP electronic charts are built into both the shore and vessel based software interface, allowing vessels to perform depth and obstruction checks before accepting a route.
"After a thorough tender process and onshore/offshore trials, we determined Jeppesen's quality weather data and forecasting models, combined with its advanced user interface for both vessels and shore staff, made the company's solutions a good fit for BP Shipping," said Dan Read, Global Voyage Operations Manager, BP Shipping. "We are excited to continue working with Jeppesen on this suite of solutions for our vessels and shipping operations."
MARINE RESOURCES
Marine Log News
Related Items
- 2011-07-13 - MHI reinvents the Moss-type LNG tanker
- 2012-04-17 - Cheniere gets FERC approval for Sabine Pass LNG export facility
- 2012-04-20 - Wärtsilä reports increase in order intake
- 2012-04-02 - Wärtsilä Hamworthy wins third Höegh LNG regas technology contract
- 2012-05-22 - GL and MAN study looks at LNG as containership fuel
- 2012-06-01 - Exmar awards Wison EPCIC contract for world's first FLRSU
- 2012-07-16 - Kleven to build LNG-fueled PSV for Remøy Shipping
- 2012-08-07 - Excelerate Energy orders eight FSRUs from DSME
- 2012-10-09 - Waller LNG ATB gets ABS approval in principle
- 2012-10-19 - First steel cut for Prelude FLNG
- 2012-11-12 - Wärtsilä sales of gas-fueled engines top 2,000 mark
- 2012-11-13 - Waller Marine to develop small-scale LNG terminals
- 2012-11-21 - Incat launches LNG fueled high speed RO/RO
- 2012-11-28 - Siem LNG fueled PSV has Wärtsilä design and equipment
- 2012-11-30 - Hyundai Heavy develops new LNG tank design
- 2012-12-03 - Wärtsilä gets equipment order for LNG-fueled Quebec ferry
- 2012-12-04 - TOTE orders two LNG fueled containerships from NASSCO
- 2012-12-06 - TOTE order is first for MAN's LNG-fueled low speed engine
- 2012-12-07 - Wärtsilä to supply fifth LNG package to Harvey Gulf
- 2012-12-10 - Gas-burning low speed engine has formal unveiling
- 2012-12-11 - MHI starts construction of "peapod" LNG carrier
- 2012-12-13 - TK LNG gears up for U.S. exports with newbuild order
- 2012-12-17 - Teekay's Evensen named next CMA Commodore
- 2012-12-20 - Teekay LNG orders are second for MAN B&W ME-GI
- 2012-12-21 - LR gives approval in principle to LNG-fueled bulker
- 2012-12-26 - LNG ship orders give HHI order book a year-end boost
- 2013-01-09 - GasLog makes leadership changes
- 2013-01-10 - LNG-fueled cruise ferry delivered by STX Turku shipyard
- 2013-01-11 - EU funding for LNG bunkering vessel project
- 2013-01-16 - LNG fueled cruise ferry has Navis DP
- 2013-01-21 - DNV and KOGAS in LNG bunkering project
- 2013-01-28 - NASSCO books order for TOTE Orca class LNG conversions
- 2013-01-29 - EU funds study of barriers to LNG fueling
- 2013-02-08 - Damen Shiprepair Brest wins another LNG tanker contract
- 2013-02-13 - Teekay's LNG burning two strokes promise big benefits
- 2013-02-22 - Maersk Group turns in 2012 profit of $4 billion
- 2013-02-25 - Crowley adds Farhad Rajabi to project management team
- 2013-03-01 - LNG bunkering could be available in Australia by 2016
- 2013-03-04 - New Braemar Houston venture will advise on LNG fueling
- 2013-03-05 - Shell moves to boost U.S. availability of LNG fuel
- 2013-03-11 - Ports respond to growing interest in LNG as ships' fuel
- 2013-03-14 - Wärtsilä wins Viking Grace maintenance agreement
- 2013-03-21 - GAO reports on impacts of Jones Act on Puerto Rico trade
- 2013-03-25 - MHI and Imabari form LNG ship JV to compete with Korea
- 2013-04-10 - Rolls-Royce and Drydocks World sign LNG fueled tug MOU
- 2013-04-15 - Wärtsilä solution picked for Evergas LNG newbuilds
- 2013-04-15 - DNV offers shipowners an "LNG ready" option
- 2013-04-15 - HHI introduces new membrane LNG containment system
- 2013-04-17 - GE Power Conversion books LNG ship, FSRU orders
- 2013-04-17 - Mitsui Engineering demonstrates ME-GI engine
- 2013-04-18 - Amarcon and GTT cooperate on LNG sloshing prevention
- 2013-05-02 - Hoegh LNG ship to serve as China's first FSRU
- 2013-05-15 - ABB signs five year service deal with LNG ship operator
- 2013-05-16 - MOL inks LNG transport deal; new ship in the works
- 2013-05-16 - Davie inks deal to build two LNG-fueled ferries

