Shipbuilders at General Dynamics Bath Iron Works have completed the largest and most complex ship module movement ever executed at the shipyard. The mid-forebody section of Zumwalt, the lead ship of the DDG-1000 class of guided missile destroyers, was transported 900 feet from its assembly position inside the shipyard's Ultra Hall construction facility to the largest of the yard's three shipbuilding ways. The heavily outfitted module is about 180 feet long, over 60 feet high and weighs more than 4,000 tons. This single section represents nearly one-third of the ship's overall length. In its current position, it will be integrated with three additional "ultra units" that comprise the ship's unique wave-piercing hull form.

"The completion of this move was a great achievement for our workforce and a historic day for our company. The talents, skills and innovation of our employees have revolutionized how we build surface combatant ships in Bath, Maine," said Jeff Geiger, Bath Iron Works president. "We are a safer, more efficient shipyard than ever before thanks to our culture of continuous improvement and our determination to deliver high-quality, affordable ships to our Navy customer."
The DDG-1000 Zumwalt-class destroyer is the U.S. Navy's next-generation guided-missile destroyer. The ships will feature a low radar profile, an integrated power system and a total ship computing environment infrastructure. Bath Iron Works is the lead designer and builder for the program..
October 27, 2011
MARINE RESOURCES
Marine Log News
Related Items
- 2011-11-20 - Transpetro finalizes STX OSV LPG carrier order
- 2012-02-01 - ABG shipyard wins $104.4 million, six ship AHTS order
- 2012-03-02 - Germany's FSG books order for versatile project cargo duo
- 2012-04-26 - JHSV 1 completes builder's sea trials
- 2012-05-20 - Bath Iron Works Machinists ratify new four year labor contract
- 2012-05-22 - Graig to supervise ten more bulker newbuilds at Jiangsu Rongsheng
- 2012-06-04 - Cecon faces new delay to Davie newbuilds
- 2012-06-08 - Austal lays keel for first Cape Class patrol boat
- 2012-08-15 - Austal USA honors apprenticeship program grads
- 2012-08-29 - Austal results "below expectations"
- 2012-09-03 - Abu Dhabi Mar eyes P+S Werften
- 2012-09-10 - Lauritzen JV orders North Sea accommodation semi

