Marine Log

Sample releases ballast water treatment guide

ferrysunset 340x255ABS has released a new Guide for Ballast Water Treatment to help vessel owners and operators prepare for compliance with the IMO's International Convention for the Control and Management of Ships' Ballast Water and Sediments, 2004.

The convention is designed to provide a unified instrument to prevent, minimize and ultimately eliminate the transfer of harmful aquatic organisms via ships' ballast water and sediments. As of November 1, 2011, 30 member States representing 26.44 percent of world merchant shipping tonnage had ratified the convention against a required 30 States representing 35 percent of the world gross tonnage.

With the possibility that the convention may enter into force during the first half of 2013, owners are examining options for newbuilds and retrofits that will give them flexibility in terms of costs and operation, says Kirsi Tikka, ABS Chief Engineer and head of the society's environmental solutions efforts.

"The ballast water management regulations can be confusing for shipowners because they contain many unresolved and complex issues," Dr. Tikka adds. "As a result, some owners with newbuilds have elected to incorporate the installation of a ballast water treatment system, while others have chosen to have their vessel outfitted with the piping, electrical arrangements and space necessary to accommodate a ballast water treatment system in the future."

The newly released ABS guide has been developed to assist owners in understanding the classification requirements relating to the convention. In addition to the installation parameters required for any ABS-classed vessel utilizing an IMO member State type approved ballast water treatment system, the Guide offers owners two optional notations to demonstrate further due diligence in their ballast water management practices.

The tiered notations BWT and BWT+ will bring the ballast water treatment system under survey and the class society will review the system for compliance with the guide, confirm the installation design, conduct a survey during installation, periodically evaluate the onboard ballast water management system and perform shipboard function tests. The BWT+ notation signifies that the installed treatment system has been surveyed by an ABS surveyor at the manufacturing facility.


November 7, 2011

 

Breaking News

monitor-coatings-to-supply-uk-carrier-flight-deck-coatings
August 22, 2014
Monitor Coatings to supply U.K. carrier flight deck coatings
AUGUST 22, 2014 — After a two-year test program, Monitor Coatings Ltd. has been awarded a contract to provide a nonskid, thermal gas wash resistant deck coating for the two largest ships ever built for the U.K. Royal Navy, the aircraft carriers...
ex-saratoga-heads-to-texas-recycling-yard
August 22, 2014
Ex-Saratoga heads to Texas recycling yard
AUGUST 22, 2014—The final voyage of the Saratoga got underway yesterday, as the distinguished aircraft carrier began her tow from Pier 1, Naval Station (NAVSTA) Newport, Newport, RI, to her final destination at ESCO Marine, a dismantling...
siem-sells-oscv-duo-to-charterer
August 22, 2014
Siem sells OSCV duo to charterer
AUGUST 22, 2014 — Norway's Siem Offshore has entered into an agreement with Malaya's Daya Materials Bhd. (“Daya”) for the sale of the two 2013-built Offshore Subsea Construction Vessels (OSCVs) Siem Daya 1 and Siem Daya 2 for a total price of...
eu-russia-trade-dispute-hits-dfds-service
August 22, 2014
EU-Russia trade dispute hits DFDS service
AUGUST 22, 2014 — Copenhagen, Denmark, headquartered DFDS Seaways is feeling the impact of the sanctions tit for tat between the EU and Russia resulting from Russia's actions in Ukraine and Korea. On June 14, 2014, DFDS launched a new service...
vigor-set-to-welcome-giant-floating-dry-dock
August 22, 2014
Vigor set to welcome giant floating dry dock
AUGUST 22, 2014 — Vigor Industrial is getting set to welcome its new giant floating dry dock, the Vigorous. It is set to arrive in Portland, OR, Sunday. Fully assembled, the dry dock will be 960-feet long, with an inside width of 186 feet and...
lng-america-names-cryogenics-system-designer-for-bunker-barge
August 21, 2014
LNG America names bunker barge cryogenics system designer
AUGUST 21, 2014 — LNG America has selected Taylor-Wharton to start the front-end engineering and design work for the cryogenic topside of its 3,000 cu.m Gemini Class LNG bunker barge scheduled for delivery at the end of 2015. Jensen Maritime...
scottish-shipbuilder-books-fish-farm-vessel-orders
August 21, 2014
Scottish shipbuilder books fish farm vessel orders
AUGUST 21, 2014 — A contract worth in excess of £3.3 million (about $5.5 million) has been secured by Macduff Shipyards, Aberdeenshire, Scotland, from Scottish Sea Farms. The contract is for four 150 t steel feed barges and two 15 m landing...
havyard-starts-fitting-out-offshore-wind-service-vessel
August 21, 2014
Havyard starts fitting out offshore wind service vessel
AUGUST 21, 2014 — Havyard's Leirvik, Norway, shipyard is now fitting out the first of two Havyard 832 SOVs (Service Operation Vessels) for ESVAGT of Esbjerg, Denmark, which will operate them as wind farm service vessels. They are due to be...
eb-gets-contract-worth-up-to-3-million
August 21, 2014
EB gets contract worth up to $32.3 million
AUGUST 21, 2014 — General Dynamics, Electric Boat Corp., Groton, Connecticut, is being awarded a $8,990,973 cost-plus-fixed-fee contract for the ongoing acquisition of the weapons systems shipboard development, integration requirements, and...
nakilat-damen-delivers-mooring-boats
August 21, 2014
Nakilat Damen delivers mooring boats
AUGUST 21, 2014 — Nakilat (Qatar Gas Transport Company) reports that Nakilat Damen Shipyards Qatar has delivered two 16-m mooring boats to towage operator Nakilat SvitzerWijsmuller. The two Stan Tug 1606 mooring boats — named Ras Al Allaj...